An independent survey of installed plant, delivered as a risk-ranked, costed maintenance plan the client could budget against.
Every major asset was inspected and recorded — visual and dimensional checks, thermographic survey of electrical distribution, insulation testing, vibration readings and structural assessment of supports and access platforms.
Findings were ranked by operational risk, each with a recommended remedy, indicative cost and suggested timing, so the client's engineering team could build a defensible maintenance budget rather than react to failures.
Outcome
- Risk-ranked asset register delivered
- Costed remedial plan for budgeting
- Priority safety items identified for immediate action
Project Details
- Sector Food & Beverage
- Location Dhaka, Bangladesh
- Duration Survey and reporting
- Scope of work Mechanical, electrical and structural condition assessment with costed recommendations