Utility equipment tagged, dismantled, transported and re-erected at a new facility, then recommissioned to original performance.
Each system was surveyed and tagged before disconnection, with photographic records and cable schedules captured so reinstatement would match the original configuration exactly.
Equipment was rigged out, transported, set on new foundations and reconnected to utilities. Commissioning followed the original manufacturer procedures, closing with performance verification and operator familiarisation.
Outcome
- Original performance re-established
- Complete as-built records at the new site
- Operator familiarisation on handover
Project Details
- Sector Pharmaceuticals
- Location Dhaka Division, Bangladesh
- Duration Turnkey package
- Scope of work Dismantling, transport, re-erection, utility connection and commissioning