From foundation checks to the performance guarantee test, our erection teams install and commission mechanical, electrical and structural systems to manufacturer procedure and site safety standards.
The process begins with detailed site planning: foundation and anchor verification, rigging studies, equipment sequencing and a method statement agreed with your project team before a single lift is made.
Installation covers structural, mechanical and electrical scope — alignment and levelling to tolerance, secure cable laying and termination, then power-on checks, cold testing and drive charging. PLC programming and field instrument setup follow, closing with load tests and performance guarantee runs that confirm compliance with safety standards before a documented handover.
Key phases of delivery
Each stage closes with a record, so progress is visible and nothing is assumed.
Planning & Installation
Site survey, rigging plan, equipment selection and installation of structural, mechanical and electrical components.
Testing & Calibration
Power testing, cold testing, PLC programming and calibration of field instruments for optimum performance.
Validation & Handover
Load and performance guarantee testing, safety compliance sign-off and a fully documented handover.
What you get
- Certified riggers, fitters and electricians
- Method statements and job safety analysis for every lift
- Precision alignment, levelling and torque records
- As-built documentation and handover dossier
Ready to start?
Send us the specification, the drawing, or simply a photograph of the nameplate. We will come back with the technical options and a clear price.
Request a QuotationOur Services
Get In Touch
Speak to an engineer about this service.
+880 1909855155 hq@leadtraco.com Request a QuoteWhy LEADTRACO
- One partner from supply to handover
- Documented, auditable execution
- Dhaka & Chattogram coverage
- Breakdown response when it matters